- Description
The POWER STATION provides the current to the rails to power the locomotive while also delivering the digital signal from the COMMAND STATION to the locomotive or stationary decoder - each power station is divided into two 5 amp sub-stations - each sub-station provides the power and signal to a section of the layout called a DISTRICT - DISTRICT boundaries are determined by the assumption that up to 12 locomotives may be operating within its boundaries at any given time, and calculating the total amperage required for their operation - the sub-station is connected to a district using a pair of #10 bare solid copper buss wires.
- #1 - districts A & B
- #2 - districts C & D
- #3 - districts E & F
- #4 - districts G & H
- #5 - districts I & J
- #6 - districts K & spare
Location
- #1 - under the lower level at Chico Wye tower
- #2 - under the lower level at Chico engine service tracks
- #3 - under the lower level at Chico engine service tracks
- #4 - under the lower level between the entry door and the dispatcher's room
- #5 - under the lower level at Raymond
- #6 - under the lower level between the entry door and the dispatcher's room
- #1 POWER STATION (districts A & B) [INSTALLED]
Located under the lower level at Chico Wye tower - the signal cable is routed from the COMMAND STATION located under the lower level benchwork between the entry door and the dispatcher's room, under the Valley Staging benchwork, to the #1 POWER STATION.
DISTRICT A - Valley Staging, Richmond Staging & Sacramento Northern Staging yards, to the crossover at Chico Wye tower; bottom 1/2 of helix to upper deck.
DISTRICT B - Santa Fe mainline from crossover at Chico Wye tower to just south of Sambone; New Chico arrival & departure yard; freight by-pass around main at Chico station; large industry across tracks from roundhouse
- #2 POWER STATION (districts C & D) [INSTALLED]
Located under the lower level at Chico engine fueling tracks - the signal cable is routed from the #5 POWER STATION located under the lower level benchwork at Raymond, under the lower level benchwork, around the end of the 'yard' aisle, to the #2 POWER STATION [temporarily being routed from the #1 POWER STATION under Chico Wye Tower until the #5 POWER STATION under Raymond is installed]
DISTRICT C - South Chico classification yards & switchleads; Chico industrial tracks; hidden industrial loop; engine service lead from mainline; engine service & roundhouse tracks.
DISTRICT D - Santa Fe engine service balloon track (reverse loop) - starts at turnout from the freight bypass track next to Chico diesel shops, around Chico roundhouse, to the engine service lead, to turnout just north of 8th & 9th Ave/Chico Creek bridge.
Located next to #2 POWER STATION under
- #3 POWER STATION (districts E & F)
the lower level at Chico engine service tracks - the signal cable is routed directly from #2 POWER STATION to the #3 POWER STATION.
- DISTRICT E - Santa Fe mainline from just south of Sambone to just south of Red Bluff; Sambone switching area; Los Molinos switching area; Massi branch.
DISTRICT F - Sierra Western branchline tracks from Douglas to end of line at Heldatt; Douglas switching area; Sierra Western roundhouse, yards & loop at Douglas; Heldatt switching area.
- #4 POWER STATION (districts G & H)
Located next to the COMMAND STATION under the lower level benchwork between the entry door and the dispatcher's room - the signal cable is routed directly from the COMMAND STATION to the #4 POWER STATION.
DISTRICT G - Santa Fe mainline from just south of Red Bluff, through Anderson, to just north of Redding; Red Bluff switching area; Anderson switching area.
DISTRICT H - Southern Pacific mainline from Red Bluff Staging loop to Redding Staging yard and loop; Redding switching area.
- #5 POWER STATION (districts I & J)
Located under the lower level benchwork at Raymond - the signal cable is routed from the #1 POWER STATION located under the lower level at Chico Wye tower, under the lower level benchwork, to the #5 POWER STATION.
DISTRICT I - Santa Fe mainline from just north of Redding, through Douglas, to just south of Raymond; rock and gravel plant at Raymond.
DISTRICT J - Santa Fe mainline from just south of Raymond to entrance to Santa Fe Oregon/Washington Staging yard just north of McCloud; Raymond switching area.
Located next to the #4 POWER STATION u
- #6 POWER STATION (districts K & L)
nder the lower level benchwork between the entry door and the dispatcher's room - the signal cable is routed directly from the #4 POWER STATION to the #6 POWER STATION.
DISTRICT K - Santa Fe Oregon/Washington Staging yard; McCloud RR Staging yard; McCloud RR branchline tracks from end of line at South McCloud to McCloud RR staging yard; McCloud switching area; top 1/2 of helix to lower level.
DISTRICT L - Spare